November 3 the mural was transferred from my patio and installed at the front entrance of the school.
Thanks very much to Sparks Construction for doing such a great job in the installation.
![]() |
||
| Pre-Kpanel installed at the school | Several panels before they were moved from my home to the school | |
![]() |
![]() |
|
| Orange girl being installed | ||
![]() |
||